The problem
Downtime costs more than the repair.
When a line stops, you’re paying for idle staff and missed orders, not just the repair. The most expensive fix is the one that fails again next week.
So we work through the whole chain: control circuit, protection, drive, motor and the mechanical load. Then we write up what we found and what we did, for your maintenance records.
error
Intermittent faults
Machines that trip once a shift and test fine afterwards.
warning
Nuisance tripping
Overloads and protection devices operating for a reason nobody has traced.
memory
Obsolete components
Drives and controls no longer supported, with no spares on the shelf.
engineering
Maintenance backlog
A list your in-house team never gets clear time to work through.
Scope of work
What we diagnose and repair.
Faults & diagnostics
Industrial breakdown response
Machinery and production-equipment fault finding
Electrical control-circuit diagnostics and repair
Three-phase motors, motor starters and overload faults
VFD diagnostics, replacement and commissioning
Contactors, relays, timers, sensors and solenoid faults
PLC input/output fault diagnosis
Electrical panel and switchboard fault diagnosis
Equipment worked on
Machine wiring, modifications and electrical repairs
Pumps, compressors, conveyors and extraction systems
Emergency stops, interlocks and safety-control circuits
Fabrication and workshop equipment
Production lines and packaging machinery
Ovens, mixers and hydraulic power units
Automated machinery and process equipment
Maintenance & planning
Preventive and scheduled maintenance
Planned shutdown support
Maintenance backlog clearing
Equipment upgrades
Obsolete-component replacement
Process
From call to back in production.
01
Call or enquiry
Tell us the machine, the symptom and whether production has stopped. We’ll give you an honest time we can be there.
02
Diagnose on site
Proper fault finding, not swapping parts until something works.
03
Repair or make safe
Fixed on the spot where we can. If parts are needed, it’s made safe and you get the plan and the lead time.
04
Report and prevent
What we found, what we did, and what to schedule so it doesn’t happen again.
On site
Control boards and cable runs.
-
Control board with panel meters and E-stop
-
Cable ladder run between enclosures
-
Colour-coded cabling into tray
